Get Quote
Home > Products > By type > Centrifugal Fans > R4E310-AP11-09/F01 | ebm-papst 230V 160W Centrifugal Fan for New Energy

R4E310-AP11-09/F01 ebm-papst Centrifugal Fan

Brand :
ebmpapst
Model:
R4E310-AP11-09/F01 | ebm-papst 230V 160W Centrifugal Fan for New Energy
Type:
Centrifugal Fans
Industry:
New Energy
Description:

Used in New Energy, the ebm-papst R4E310-AP11-09/F01 is a 230 V AC backward-curved centrifugal fan, whose supplied data highlights a listed pressure capability of 290.7 Pa. The rating aids system-fit checks.

Datasheet:
R4E310-AP11-09/F01 | ebm-papst 230V 160W Centrifugal Fan for New Energy Datasheet (Pdf)

Product Features

Rated Voltage(V)230
Size(mm)310
Max.Air Flow(m³/h)2370
Max.Pressure(Pa)290.7
Input Power(W)160
Speed(rpm)1580

Product Features

Reliable AC Cooling

R4E310-AP11-09/F01 is an ebm-papst AC centrifugal fan for New Energy, where controlled heat removal and airflow management must match the actual duty point. Its model-specific format supports OEM builds, retrofit planning and replacement sourcing.

Documented selection points include 230 V supply, 160 W input, 310 mm size, up to 2370 m3/h airflow. These values support electrical, envelope and duty-point comparison.

For procurement, verify voltage, duty point, dimensions, connector and mounting. Correct sizing and clear airflow paths support stable operation, controlled noise and long service life. Confirm speed control, IP protection and approvals in the exact-model datasheet. The listed ratings help buyers screen compatibility before final duty-point review.

Application Industry

Frequently Asked Questions

How can noise be managed when using the R4E310-AP11-09/F01?

Noise data is not listed in the supplied table. Use unobstructed airflow, secure mounting and suitable isolation where required.

Is the R4E310-AP11-09/F01 easy to maintain?

Provide service access, keep the airflow path clean, inspect wiring and mounting, and investigate abnormal noise or vibration before continued use.

What installation checks apply to the R4E310-AP11-09/F01?

Verify mounting orientation, inlet and outlet clearance, fastener security, electrical connections and the exact dimensional drawing before startup.

Message Form